The Goal: Tear off the roof on the backroom, finish enough framing to get the plumber and electrician working, and maybe just maybe install new windows.
Well, that kind of got scrapped before the weekend even started. We planned on finally having our permit after 10 nauseating weeks. Alas, we achieved plan approval on Friday at 4pm after a lot of red ink and copying by Matt in the Village Hall Building department making final revisions. However, we did not have all the necessary updated licenses and insurance for our contractors to get the big yellow card for our front window. Thus, we scrapped the brazen idea of ripping off the back roof in broad day light without a permit. Also our current electrical service run through where we want the gable to end, so we realized we have to wait for the electrician, who is going to put in a new service. We’re still on fuses, and are changing the one to the garage every other week with Liz’s projects out there. But it sure would have been fun. Stay tuned for my Wizard of Oz themed parable on the permit review process in the Emerald Oak Park.
Then our windows plan was in ruin. Our Jeld-wen windows from Home Depot arrived on Friday morning with a possibility of next day delivery on Saturday. The only problem was all the back room windows were missing our cottage style grills. So two hours at Home Depot and much wrangling over the phone, half the windows were going back and the replacement windows for the bedrooms and dining room were be delivered early Saturday morning (I got a call at 6:30 AM when I’ve been working nights for the past month, argghh!). But this window saga was happening at the same time as the rush to get our permit, so Matt had to leave me to fend through the westside CTA. I love and hate (late buses) the CTA, but never have I smelled anything so foul as somebody who was s*itting behind me on the Cicero bus. (more…)
Tags: bus, contractors, CTA, Demo, dry-wall, electrical, framing, home depot, jeld-wen, kitchen, Martin, permit, plaster wood lathe, plumbing, roof, sunroom, Village of Oak Park, windows, Work Weekend
The ultimate goal is to be done with the kitchen, bathroom, and sunroom by Nov. 1, knowing that that goal will probably end up being Thanksgiving.
To keep on track with that goal we have set up a tentative schedule with no real dates yet, but we just keep trying to plug away at things on the list. Here is the rough sequence of things that need to happen.
There is limited things we can do without a permit like floors, demo (under the cover of darkness), painting, and trim. After that things SHOULD be done by permit. Often they are not, but if you get caught you can face some heavy fines and when we sell the house we want to be able to say everything is up to code and we did it right.
So assuming a permit is obtained, the sunroom needs to be framed so that we can do the electrical and the plumbing should go before electrical as common construction courtesy. That leaves us with all the set up to squeeze in between the major work weekend that the sunroom will require before we turn it over to the pro plumbers and electricians. The tricky part will be trying to minimize the amount of time we are living in the house without a bathroom- demoing the tub right before the plumber drops in the new tub and shower and then putting up the tile quickly. All said and down I expect three to four days without a shower. (more…)
Tags: bathroom, Demo, doors, electrical, floors, inspection, permit, plumbing, schedule, sunroom, windows
The permit process in Oak Park is a long and agonizing one. Sometimes it feels like you need a permit from the village to even look at your kitchen. I will say for the village that they are very helpful during the application process, because they want you to improve your home.
So in order to get a head start on things before we move in, Thor, Matt, and I met tonight to draw up plans and, well, make a plan. First project is definitely going to be kitchen remodel.

The Sunshine Nightmare
There are no appliances in there right now, and the whole thing looks like it came out of a lemony sunshine 70’s nightmare. But… how to do it? and how will this fit in with our long term goals for the house? and what are our long term goals? (more…)